The primary activities for the period of office 2009-2011 is the fourth step of the strategy "Protection agains natural hazards in Switzerland".
Strategy:Protection against natural hazards in Switzerland
In the first step, which lasted from 2000 to 2003 PLANAT developed an overall, interlinked strategy for protection against natural hazards. In the second step, in 2004 PLANAT analysed the latest situation and developed an action plan with measures, which are being implemented during the third step (2005 to 2008) and a fourth step (2009-2011).
› Activities 2009-2011